For this project the Embrace en-suite we were asked to renew the shower enclosure, basin, toilet and wall tiles while retail the flooring. During the planning process we specified items for the renovation that would cover the holes in the flooring that would be left when the existing suite was removed. We finalise the specification by selecting the colour of tiles and style of shower enclosure.

Embrace en-suite Embrace en-suite Embrace en-suite

Stripping out

Our engineer begin be removing the existing suite and tiles while protecting the flooring. Then he fixed the pipe work for the shower and repaired the walls in preparation for tiling. In this instance we did not alter the pipe work for the toilet and basin because we retained the floor. The shower tray was installed and started the tiling. For this installation the tiles were fitted in a brick design.

Embrace en-suite Embrace en-suite Embrace en-suite

The final fix

With the tiling complete in this Embrace en-suite our engineer installed the toilet and basin with the mixer tap. The Roman Embrace shower enclosure was installed along with the bar mixer shower. We also replaced the radiator and as we could not access the pipe work under the floor our engineer used chrome pipe and fittings to ensure a neat finish.

Embrace en-suite Embrace en-suite Embrace en-suite

Finally for this Embrace en-suite the addition of PVC to the side of the toilet and basin tidy up the last of the exposed pipework. A chrome door stop was also fitted to spot the door knocking the new tiling. In conclusion call into our bathroom showroom in Grimsby to discover your new bathroom.